Belmopan Building Permit Requirements
Belmopan Building Permit Requirements
- Two complete sets of working drawings for house plans
- Complete building permit form provided
- All taxes must be paid in full before drawings can be approved.
- Pay building permit fee, which is based on square footage of building.
- Pay deposit for removal of construction debris, which is a minimum of $100.00 per load.
- Deposit is refundable after two weeks of completion of house and inspection is done by the Engineering Section.
- Deposit is not refundable, if after two weeks construction debris is still on the street side the Council keeps the deposit and removes the debris.
- Drawings are sent to the City Engineer for approval, and are returned back by the following day, if it is approved.
- Drawings that have been approved, one set is given back to the house owner and the other kept on file in the Engineering Section.
- A complete set of approved drawings must always be on site for inspection by the Engineering Section.
- Permission must be given by the Engineering Section for construction material to be stored on streets.
- Waste Disposal Plan should include details of septic tank, soak away etc.
Planning Application Fees:
- Residential: Up to 800 sq. ft. $50.00 plus $10.00 for every additional 100 sq. ft or part thereof.
- Commercial/Industrial: Up to 500 sq. ft. $100.00 plus $20.00 for every additional 500 sq. ft. or part thereof.